WEPTECH
News & Events
Start of commissioning of the new production line
Now the time has finally come: The SMD area of the new production hall has been cleaned, the power supply and air-conditioning systems are in operation, and the machines are set up. The nitrogen tank is filled and the compressed air flows powerfully through the hoses. Just a quick alignment and connection, then it's time to get started.
Together with the specialists from JUKI Automation Systems, ACHAT5, SMT Thermal Discoveries and Viscom AG, our employees put our modern, brand-new production line into operation. It is a different, more ergonomic way of working in the new premises and everyone is hurrying so that serial production can start quickly and create free capacity in the existing plant for processing the many other customer orders. The material is put on the shelves in no time at all and then the first assemblies are started.
The new line noticeably increases the capacity of our production and the radio modules manufactured there actively contribute to the success of the rapid digitization of our German energy network.
We are still looking for employees for our diverse tasks in the new, expanded production, e.g. machine operator SMT (f/m/d), Technician Work Preparation or Optical Inspection (m/f/d) and Process Technologist (m/f/d). Become part of the digitization of energy systems and apply with us.
.